Effluent Program Overview

Wastewater Treatment Plant (WWTP):

  • Before 1978: Two wastewater treatment package plants served the south side of town:
    • One package plant was between the Lago Vista Golf Course (LVGC) 16th & 17th greens. Effluent from this plant was utilized by the owners of the golf course reducing the amount of purchased water.
    • The other package plant was at Emerald and Boggy Ford Road but was not brought online.
  • The Municipal Utility District (MUD) WWTP was brought online in May 1978 and decommissioned in November 2005. During that time, effluent was discharged on the LVGC and into Lake Travis.
  • The City agreed to move forward to discontinue discharging into Lake Travis in the late 1990’s.
  • The new WWTP was started up in November 2005 but was not in full operation as a 0.600 MGD plant until January of 2006 when Cedar Breaks was completed.
  • The City developed the Cedar Breaks Irrigation Project as an effluent disposal site primarily to eliminate the need to discharge into Lake Travis. Cedar Breaks was finished in January 2006. The new WWTP discharged effluent on the LVGC and Cedar Breaks. Shortly thereafter effluent was made available to the Bar K Golf Course (Bar K GC).
  • Current discharge permit requires that 128 acres of the LVGC and 67 acres of the Cedar Breaks be reserved for the WWTP effluent with a maximum effluent application rate.

 

City Effluent Disposal Permits:

  • 205 (Fixed permit): Tied to the WWTP 0.600 MGD maximum production allowed. Sets a maximum effluent application rate for the LVGC 128 irrigated acres and the Cedar Breaks 67 irrigated acres.
  • 210A (Flexible permit): Allows for the application of effluent to the remainder of the LVGC and Cedar Breaks, Bar K GC, and the HLGC. Effluent can be applied to the acreage using best practices where ponding, pooling, run off or failing a soil metals test does not occur.

 

City Effluent Disposal Irrigated Areas

Cedar Breaks 67.0 Acres
Bar K Golf Course 64.96 Acres
Lago Vista Golf Course 156.35 Acres
  • In 2015, the City will submit an application for the LVGC to increase the effluent application area by 28.35 acres that has had irrigation piping installed. This provides irrigation capacity for when the WWTP reaches 0.750 MGD production.
  • In 2015, the City will also submit the Highland Lakes Golf Course (HLGC), approximately 130 acres, as part of the new permit. This provides irrigation capacity for when the WWTP reaches 1.000 MGD production.

 

Funding Sources For Effluent Program:

  • WWTP Expansion: Bond money
  • Cedar Breaks Transmission Line: Bond money (Line runs from Pond 17 to the Cedar Breaks.)
  • Cedar Breaks: Bond money
  • Highland Lakes Golf Course (HLGC): Funded by the Centex Settlement and a $100,000 grant from the Lower Colorado River Authority (LCRA).

 